Slow restores in us-east-1
- Incident
- INC-20250909
- Date
- 9 September 2025
- Impact
- Degraded performance
- Components
- Restore service (us-east-1)
- Duration
- 7 h 40 min
- Status
- Resolved
Summary
Between 11:50 and 19:30 UTC on 9 September 2025, restores from us-east-1 ran at around 25% of normal throughput. All restores completed. Backups were not noticeably affected.
Cause
A disk failed in one storage node at 11:42 UTC and the storage system began rebuilding onto a spare, as designed. The rebuild was running at a priority that had been raised during commissioning of that node and never lowered, so it took most of the node's I/O capacity.
Resolution
Rebuild priority was reduced at 14:15 UTC, which improved throughput to about 70% of normal. The rebuild completed at 19:30 UTC.
Actions
- Rebuild priority has been checked and corrected on every storage node in all regions. Done.
- Configuration drift on storage nodes is now reported weekly. Done.
One restore in this period exceeded the published turnaround time. The tenant concerned was contacted directly.